Hy-Vac have been involved in a number of building programs, but our specialty lies in Space Utilisation Projects.
An example can be seen here - a childrens adventure park, where the current layout of the building prevented efficient use of the space. There was a large locker and changing area, and a long snaking corridor that served little purpose.

The previous, large locker area

Old Corridor

Proposed Plan

The previous, large locker area
1/3

Stud Wall Installation

Stud Wall Installation

Fitting FireLine Plasterboard

Stud Wall Installation
1/3
We removed a wall, and made the resulting space into the new locker zone. The previous locker space was converted into 3 party rooms, a store room, and a reception/check-in area.

New Locker Zone

The new Party Rooms, viewed from Reception

Store Room

New Locker Zone